Fishbone Engineering CPS PDF Print E-mail

Fishbone Engineering’s CPS offers a turn key solution for pipe pressure-testing, rotating equipment installation, system turnover and commissioning services. This is accomplished through integrating procedures from the inception of the engineering process that focus on project completion. These procedures begin at P&ID’S / Isometric drawing review for scoping handover systems and further defined into pressure testing and equipment installation packages. Fishbone performs third party auditing, document control, systems testing and commissioning services to provide our clients with improved control on their large capital projects.

 

PERSONNEL
  • Highly qualified project managers
  • Fishbone offers professionals having worked with a variety of EPC companies and clients worldwide.

 

APPROACH

 

  • Simple systematic approach that begins and performs with the end in mind.
  • Adept in equipment installation, pipe pressure-testing, system turnover, and unit start-up methodologies, our capital projects models incorporate best practices and lessons learned to deliver the highest quality product, on time.

 

SCOPE FOR TESTING

 

  • Front-end development of system scoping and pipe pressure-testing program.
  • System boundaries and pipe pressure-test limits are established as drawings become available from engineering.
  • Scoped P&ID’s, isometric drawings, inspection records, and release notices are assembled into a test package format as early as possible.

INSTALLATION
  • Equipment installation and construction maintenance practices that optimize performance and reliability.
  • All skid mounted rotating equipment less than 200 HP is thoroughly inspected by criteria established in API-686 before being pre-grouted and shipped to site.
  • Specific vendor maintenance and long-term storage requirements are identified and scheduled prior to equipment deliveries.

TESTING EXECUTION
  • Piping pressure-test / restoration program specifically focused on system turnover.
  • Our testing coordinators work closely with construction to prioritize bulk installations, thus supporting an aggressive hydro-testing and restoration schedule. Specific divisions of responsibility are identified with a clear understanding and commitment of what constitutes mechanical completion.

 

TRACKING AND AUDITING

 

  • Automated tracking tools ensure timely transitions between construction, pipe pressure-testing, system turnover and start-up activities, reducing costly delays.
  • Our system maintains established project priorities and provides clients another independent source to audit progress.

COMMISSIONING AND START-UP

 

  • Our start-up technicians provide support to plant operation and maintenance departments for lube oil flushing, hot alignments, pressure relief valve testing and installation or any other activities to get the unit on line.
  • Fishbone CPS consultants assist in writing start-up procedures, etc. as required by client.

 

 

 

 

Fishbone offers specialized capital project solutions focusing on meeting our client’s delivery dates. We realize the diverse requirements associated with our individual clients needs and can tailor our models accordingly. We provide our services throughout the United States and beyond. Call us for a full presentation of our systems and services at (281)538-8700 (Home Office).

 

 